The Execution of the road linking between Al Hufaz Bridge and Nazim No. 4

Dhi Qar Province
Beneficiary
General Authority for Roads and Bridges
Commencement Date
26 / 11 / 2007
Completion Date
12 / 04 / 2010
Project Cost
7,892,548,000 I.D
Executing a road linking between Nazim No. 4 and Al Hufaz Bridge with a length of 28 KM long by executing a dirt ramp, dual tubular and box barrages of 60 CM diameter, and single barrages with 1m, followed by spreading a layer of sand-gravel of 30 CM thickness and 65 m width, topped with a layer of asphalt 10 CM thick and 6 M wide. The company also added supportive layers of 1.5 M wide on both sides to strength the road. As a result of the good performance in executing the project, the company received an appreciation letter from the Council of Dhi Qar Province