The project's importance lies in providing farmers with an easier access to their homes and farms that is safe for them and their vehicles. In addition to facilitating crop transfer. This project was implemented using the best construction standards, and was delivered in a timely manner within the contract period.
The Beneficiary of the project sent a letter of appreciation for the company for its efforts. a rural road of 28 KM was established. The company's works included a ramp dirt, tubular and box barrages, followed by installing two layers of sand-gravel (class B) of 6.5 M width and 30 CM thickness, and strengthening the road with 1.17 M wide supportive soil on each side. The work was completed by spreading a layer of bituminous foundation that is 6 M wide and 10 CM thick.