Water Networks Extension in Makhmour District

Nineveh Governorate
Beneficiary
Nineveh Water Directorate
Commencement Date
28 / 02 / 2007
Completion Date
21 / 06 / 2007
Project Cost
802,500,000 I.D
For this project, ductile pipelines were imported from the world's best manufacturers of conveyor lines. The Company was responsible for digging, extending pipelines and linking them together, in addition to the establishment of a network of plastic pipes, which covered all villages within the district. And to preserve the life of pipelines and their durability, they were embedded with a 10CM thick layer of river sand, followed by a layer of natural soil, then finishing the works by leveling the land.