Two oil pools were dug and built in the project. The first one was 65 M long and 30 M wide.
the second 70 M long and 30 M wide.The works for the first pool included; casting the floors and walls with reinforced concrete 3 M high, and building gates to separate oil and water using concrete outlets established for drainage.
For the second pool; digging works were 5 M deep, and stone cladding works were done. The purpose of the second pool is to collect crude oil using concrete outlets from the first pool after separating it from water.