The Establishment of a Facility to Control the Water Pollution of Oil Valley

Karkuk Governorate
Beneficiary
North Oil Company
Commencement Date
17 / 09 / 2005
Completion Date
30 / 09 / 2006
Project Cost
480,000,000 I.D
Two oil pools were dug and built in the project. The first one was 65 M long and 30 M wide. the second 70 M long and 30 M wide.The works for the first pool included; casting the floors and walls with reinforced concrete 3 M high, and building gates to separate oil and water using concrete outlets established for drainage. For the second pool; digging works were 5 M deep, and stone cladding works were done. The purpose of the second pool is to collect crude oil using concrete outlets from the first pool after separating it from water.