Several buildings were built in this project, including: an Awqaf Directorate consisting of 5 floors equipped with elevators; a school; guests reception; in addition to many residential buildings and other facilities.
The company has executed all works related to the project with the exception of the design. The work included survey works, land filling, rolling, and concrete pouring for each of the foundations, columns, building using bricks, as well as reinforcing ceilings using reinforced concrete, and all electrical works.